On a large project, general contractors commonly charge 10% to 20% of construction cost, while smaller jobs are usually billed by the hour or by the day. That percentage only means something once you know what it covers.

The most popular advice treats the fee as the price. It isn't. Two bids can both say 20% markup and still describe different jobs, because one contractor may fold permits, supervision, design coordination, cleanup, and warranty work into that number while the other bills those items on top. People searching how much do general contractors charge get a tidy range and stop there. The range is a billing habit, not a receipt. Until you can point to the lines inside it, you can't tell whether a lower total is a better deal or a thinner scope.

Typical General Contractor Rates by Pricing Model

Most general contractors bill in one of four ways. The common benchmark is a 10% to 20% markup on total construction cost for large projects, while smaller jobs usually run on hourly or daily fees. That 10% to 20% range comes from common guidance, not a verified survey, so confirm any percentage against the written bids in front of you.

Pricing model Typical charge Best fit What to confirm
Percentage of total construction cost 10%–20% on large projects Large, multi-trade builds Whether permits, design, and supervision sit inside the percentage
Fixed (flat) fee One agreed total for a defined scope Projects with complete plans Allowances and change-order rules
Hourly or daily rate Billed per hour or day worked, with no percentage attached Small repairs and short jobs Crew size, minimum billing, and materials markup
Cost-plus Actual costs plus an agreed fee written into the contract Scope that may still change Fee percentage and open-book cost records

The same 15% can pay for supervision, permits, and warranty work in one quote and exclude all of them in another. Until those inclusions match, the percentages aren't comparable, and the lower number can be the more expensive contract once the missing lines show up.

A billing structure, not a fixed price

The pricing model is how the contractor invoices, not a promise that the total stays put. One firm may use a fixed fee for the build and switch to hourly billing for change orders. Another may stay on cost-plus the whole way, which only stays fair if you can see the receipts.

Practical rule: Write down which model each bid uses before you compare totals. A percentage, a flat fee, an hourly rate, and a cost-plus fee answer different questions, and only matching models belong in the same column.

What a General Contractor's Price Actually Contains

A contractor's price is the total of direct costs, operating costs, and profit, not one markup on materials. The U.S. Census Bureau construction-spending survey defines total construction value as labor, materials, architectural and engineering services, overhead, interest, taxes paid during construction, and contractor profits. The Bureau has tracked that spending monthly since 1993, across new work and improvements in all 50 states and the District of Columbia. Profit is one slice of that value, not the whole check you write.

Think of a restaurant menu. The plate price isn't the cost of the salmon plus a tip. It also covers rent, cooks, insurance, and the owner's margin. A remodel contract works the same way.

A professional contractor sitting at a wooden table reviewing a formal project bid document and budget estimates.

RSMeans construction estimating guidance separates a defensible estimate into bare trade costs, labor burden, installing-contractor overhead and profit, general conditions, and the prime contractor's own overhead and profit. Bare costs are materials, labor, and equipment before labor burden or profit. The installing-contractor total commonly adds 10% profit to those material, labor, and equipment components. General conditions, meaning site supervision, temporary protection, coordination, cleanup, permits, and project administration, may run 5% to 15% of total cost including overhead and profit, with 10% as the typical allowance.

Cost layer What it covers Typical share
Bare trade cost Materials, labor, and equipment before burden or profit The base of the estimate, stated in dollars
Labor burden Payroll taxes, workers' compensation, and insurance on labor Added to bare labor before profit
Trade profit Installing contractor's profit on materials, labor, and equipment 10% in the RSMeans installing-contractor total
General conditions Site supervision, temporary protection, coordination, cleanup, permits, and administration 5%–15% of total cost, typically 10%
General contractor overhead and profit Office, insurance, warranty administration, and the contractor's profit A stated dollar amount on top of the layers above

Why identical materials still produce different bids

Two bids can specify the same tile and the same cabinets and still land far apart. Labor productivity, insurance, supervision, scheduling, financing, and overhead aren't the same from one company to the next. A faster crew with higher wages can cost less in calendar time than a cheaper crew that stretches the job. If you want the wage side of that math in more detail, our note on calculating labor cost walks through how burden sits on top of the hourly rate.

On a kitchen or bathroom, ask whether the quote includes demolition, disposal, permits, supervision, insurance, warranty administration, and coordination of plumbing, electrical, cabinetry, and finishes. Concealed plumbing, electrical, structural, or code conditions can move the total after demolition. Mountain homeowners already know wet-wall work isn't a fixture swap. A mountain homeowners' guide to plumbing expenses is a useful companion when you're judging whether a plumbing allowance is realistic before you lock a bid.

Ask every bidder for a dollar amount on each layer before you compare headline totals. Direct work, trade profit, general conditions, and the general contractor's overhead and profit should each have a number, not a shrug.

What Pushes Contractor Rates Up in Northern Colorado

Coordination is paid professional time, even when the contractor isn't swinging the hammer. The U.S. Bureau of Labor Statistics reported a median annual wage of $114,990 for construction managers in May 2025, or $55.28 per hour. That occupation includes people commonly called general contractors or project managers. The median was $98,390 in residential building construction, $104,100 in specialty-trade contracting, and $126,690 in nonresidential building construction.

A professional general contractor wearing a hard hat, vest, and flannel shirt reviewing blueprints at a construction site.

Those figures are employee wages, not customer billing rates. The invoice also has to cover payroll taxes, workers' compensation, liability insurance, vehicles, tools, estimating, supervision, office administration, warranty obligations, and profit. The gap between wage and bill is built into the business. It isn't, by itself, proof of an inflated markup.

What actually moves the number

Charges rise with the work of holding the job together, not only with the square footage.

In Fort Collins, permit charges scale with project valuation, so a richer scope can lift the permit line even when the fee percentage stays flat. Hourly trade rates should come from local quotes, not from a national guess.

Build a sample range from at least three local bids written to the same scope. One company's starting point is a reference, not your budget.

Ask each bidder how many supervision hours they expect, who calls the subs, and who attends inspections. If those answers are vague, the rate you're comparing isn't fully priced yet.

Compare Bids Line by Line to Catch Hidden Costs

A markup label hides the shopping list underneath it. A construction rates guide points out that Fort Collins permit fees are based on project valuation, with a published schedule that separates plan-check from the building permit, and that identical markup labels still fail to show whether permits, supervision, design coordination, cleanup, and warranty sit inside the fee or beside it. A higher valuation can raise those permit charges on its own.

Say you're comparing two bathroom remodels. These totals are hypothetical, so you can see the method, not a local price list.

Bid A shows $50,000 with permits, design, cleanup, and warranty inside the number. Bid B shows $44,000, and permits, design, and cleanup are billed separately. The $6,000 gap looks like a win until you add Bid B's extras. A few thousand in permits, a design fee, and a cleanup charge can erase most or all of that gap. A thin tile or fixture allowance does the rest later, when the fixture you want exceeds the allowance and arrives as a change order.

Line item Bid A Bid B
Headline total $50,000 $44,000
Permits Included Billed separately
Design and coordination Included Billed separately
Cleanup Included Billed separately
Warranty Included Not stated in the quote
Tile and fixture allowance Named dollar amount Low or unnamed amount
Change-order rule Written approval before extra work Not written

Change orders are approved before any additional work begins. Get that rule in writing on every bid, including who prices the extra, how long you have to accept it, and whether the fee percentage applies to the new work.

Match these lines on every quote

Before you lock a tub or shower size, measuring for a new bath keeps the allowance tied to a real fixture instead of a guess that becomes a change order in week three.

How to Negotiate and Vet a General Contractor

Price moves most when the scope matches, the license is real, and the payment follows finished work. Cutting the percentage while leaving vague allowances in place usually buys you a change order, not a savings.

Mistakes that inflate the real price

We back our remodels with a 5-year workmanship warranty. Use that as a benchmark when you ask how long coverage runs and who handles callbacks. A one-year verbal promise and a multi-year written warranty are not the same product. A longer list of hiring questions sits in our guide to questions to ask a contractor before hiring.

Put three questions to every bidder. Who supervises the job on site? Who schedules the subcontractors? How is daily progress reported, in a log, a photo, or a weekly call?

Get a Written Quote Before You Sign

Don't sign a total you can't rebuild line by line. The written estimate should show each cost layer, with allowances itemized by dollar amount, a separate permit line, the written change-order process, and warranty terms that name the duration and who handles callbacks. Compare headline totals only after the billing model, the cost stack, and the inclusions match. A contractor who won't give a line-item breakdown hasn't given you a comparable price.

Read the quote against the draw schedule too. A written payment schedule with your contractor that ties each draw to a named phase belongs in the same document as the line items, so the money moves only when the work does.

SouthRay Kitchen & Bath gives estimates that are 100% free, with three custom options. Every quote includes a same-day quote, a 3D walkthrough, design consulting, and an estimated project timeline. Kitchen and bathroom remodeling projects start at $17,000, and final pricing depends on scope. Clients also get a clear breakdown of costs and project phases, which is the document you should be reading before any deposit.

Sign only when every bid shows the same layers and the same allowances. If one number can't be broken down, leave it out of the comparison.

If you're fielding several contractors at once, a service that can handle contractor calls with Mercateer keeps messages from slipping while you're still collecting matching scopes. Once the paperwork matches, you're choosing a builder on identical terms.


SouthRay Kitchen & Bath builds kitchen and bathroom remodels in Northern Colorado with a written cost breakdown, three package options, and a free estimate that includes a same-day quote and a 3D walkthrough. If you're comparing general contractor charges, start with a line-item quote instead of a single percentage. Visit SouthRay Kitchen & Bath to request that estimate before you commit.